CLIENT

EOS Energy

REGION

New York, USA

SERVICE

3D BIM Station Engineering

THE CHALLENGE

EOS Energy was developing a large-scale battery energy storage system (BESS) and needed to confirm whether the system could be safely constructed and serviced within a building before construction began.

With individual battery modules weighing approximately 7,000 lbs and installation heights reaching up to 50 feet, the project presented significant spatial, logistical, and safety challenges. The client needed a clear, visual method to validate constructability, serviceability, and human-factor considerations.

OUR SOLUTION

Power Pro created a detailed 3D model along with a step-by-step serviceability animation that simulated the entire installation and maintenance process. The model included features such as battery movement, pathways for human access, equipment-handling sequences, and time-based operations. This allowed the team to evaluate spatial constraints, identify clearance conflicts, assess timing bottlenecks, and highlight safety concerns before ordering any components.

THE OUTCOME

The completed animation provided a clear visual demonstration of the serviceability process, aligning all stakeholders on feasibility, risks, and required design adjustments. EOS Energy can now confidently validate constructability, anticipate operational challenges, and make informed decisions early in the design cycle, reducing uncertainty, minimizing rework, and improving overall project planning.