CLIENT
ALBO-HITACHI
REGION
SERVICE
THE CHALLENGE
ALBO-HITACHI was developing a complex containerized 66 kV GIS substation, with multiple disciplines and vendors contributing to the design in 2D only. This created significant coordination challenges: managing spatial constraints, resolving interface conflicts, and maintaining alignment among all stakeholders throughout the design process.
Power Pro was engaged to develop a fully coordinated 3D model that could integrate all discipline inputs and support effective design optimization.
OUR SOLUTION
We developed a comprehensive, fully coordinated 3D model using inputs from all participating disciplines and vendors. This enabled accurate assessment of spatial and physical constraints, improved clash detection, enhanced visualization, and significantly streamlined both the design process and stakeholder communication. Advanced modelling practices were applied throughout, leveraging intelligent 3D modelling and simulation techniques.
THE OUTCOME
With the coordinated 3D model, ALBO-HITACHI can now make informed design decisions earlier, confidently validate spatial and physical requirements, and proactively resolve clashes before construction. The model provides enhanced visibility across all disciplines, enabling smoother collaboration, reduced rework, and a more efficient project delivery.